The project consists of a sanitary products plant located in the Al Tajamouat Industrial Park, in the city of 10th of Ramadan, with a built up area of 43,000 m².
Supply and installation testing and commissioning of HVAC system Described as following:
-Installation of 2 water cooled chillers 650 TR each
-Installation of 4 cooling towers
-Supply and installation of chilled water piping system over 1000 m different sizes from 16" to 1.5"
-supply and installation of approximately 100 ton sheet metal duct
-Installation of the other equipment required for the system such as Ch. water pumps, condensate pumps, AHU,FCU ,fresh air and exhaust air fans